Sep 11
My rough design for the next portion of our kitchen
The "wet wall" (sink & dishwasher) is already designed. This will be the "hot wall" (stove/oven & microwave). I used SketchUp to design this section due to the ceiling beam that cuts down the middle of the room. Once these cabinets are up, I will fabricate a housing around the vacant space created by the beam.
The open section between the base cabinets will house the oven. The over-the-range microwave will go above it.


